CMA New Batches Starting from Upcoming Wednesday, Enroll Now                 Best & Oldest CMA Coaching Institute in North India                 Achieved an Impressive Total of 100 CMA All India Ranks Across The Last 15 Attempts                 CMA Offline / Live / Recorded Classes Available                 CMA New Batches Starting from Upcoming Wednesday, Enroll Now                 Best & Oldest CMA Coaching Institute in North India                 Achieved an Impressive Total of 100 CMA All India Ranks Across The Last 15 Attempts                 CMA Offline / Live / Recorded Classes Available                

Inter PN-9 OMSM Quiz 12

/25
0 votes, 0 avg
1
Created on By CA Sonal Saboo

CMA Inter

Inter OMSM PN-9 Quiz 12

This quiz is based on the CMA Operations Management and Strategic Management paper.
Each question is multiple-choice with 4 options, and only 1 option is correct.
Attempt the quiz to test your understanding of CMA OMSM concepts.

1 / 25

Category: Operations Management and Strategic Management PN-9

1. The important requirements of Monte Carlo simulation are:

2 / 25

Category: Operations Management and Strategic Management PN-9

2. Monte Carlo simulation is mainly used in for:

3 / 25

Category: Operations Management and Strategic Management PN-9

3. Wanda’s Car Wash & dry is an automatic, five-minute operation with a single bay. On a typical Saturday morning,cars arrive at a mean rate of eight per hour, with arrivals tending to follow a Poisson distribution. Find the average number of cars in line.

4 / 25

Category: Operations Management and Strategic Management PN-9

4. Which of the following is not a method for solving an assignment problem?

5 / 25

Category: Operations Management and Strategic Management PN-9

5. The main objective of an assignment problem is to:

6 / 25

Category: Operations Management and Strategic Management PN-9

6. Which among the following order represents the correct stages of the Product Life Cycle ?

7 / 25

Category: Operations Management and Strategic Management PN-9

7. The Decline phase of the Product Life Cycle is characterized by:

8 / 25

Category: Operations Management and Strategic Management PN-9

8. The Growth phase of the Product Life Cycle is characterized by:

9 / 25

Category: Operations Management and Strategic Management PN-9

9. A good product design helps an organization to:

10 / 25

Category: Operations Management and Strategic Management PN-9

10. Find the economic order quantity and the reorder point, given Annual demand (D) = 1000 units

Average daily demand (d) = 1000/365 Ordering Cost (S) = ₹5 per order

Holding cost(H) =₹1.25 per unit per year. Lead time (L) = 5 days Cost per unit (C) = ₹ 12.50

What quantity should be ordered?

11 / 25

Category: Operations Management and Strategic Management PN-9

11. M/s Kobo Bearings Ltd., is committed to supply 24,000 bearings per annum to M/s Deluxe Fans on a steady daily basis. It is estimated that it costs 10 paisa as inventory holding cost per bearing per month and that the setup

cost per run of bearing manufacture is ₹324.What is the optimum

run size for bearing manufacture?

12 / 25

Category: Operations Management and Strategic Management PN-9

12. The Economic Lot Size or Economic Order Quantity or Economic Batch Quantity is defined as:

13 / 25

Category: Operations Management and Strategic Management PN-9

13. Which among the following is an advantage of an efficient production and inventory management system?

14 / 25

Category: Operations Management and Strategic Management PN-9

14. The main purpose of MRP is to:

15 / 25

Category: Operations Management and Strategic Management PN-9

15. Material Requirement Planning (MRP) is mainly used for planning the production of:

16 / 25

Category: Operations Management and Strategic Management PN-9

16. The main advantage of process layout is:

17 / 25

Category: Operations Management and Strategic Management PN-9

17. Process Layout is also known as:

18 / 25

Category: Operations Management and Strategic Management PN-9

18. Facility Layout is also known as:

19 / 25

Category: Operations Management and Strategic Management PN-9

19. The utilisation rate helps management to determine:

20 / 25

Category: Operations Management and Strategic Management PN-9

20. The idea that “Small is Beautiful” was given by:

21 / 25

Category: Operations Management and Strategic Management PN-9

21. The term “Disappearance of Smokestacks” refers to:

22 / 25

Category: Operations Management and Strategic Management PN-9

22. Under Production and Operations Management which of the following is not an activity ?

23 / 25

Category: Operations Management and Strategic Management PN-9

23. What is the main objectives of Operations Management include:

24 / 25

Category: Operations Management and Strategic Management PN-9

24. Operations Management is primarily deals with:

25 / 25

Category: Operations Management and Strategic Management PN-9

25. PERT is   oriented technique: