Dhruv Coaching Classes

CMA New Batches Starting from Upcoming Wednesday, Enroll Now                 Best & Oldest CMA Coaching Institute in North India                 Achieved an Impressive Total of 100 CMA All India Ranks Across The Last 15 Attempts                 CMA Offline / Live / Recorded Classes Available                 CMA New Batches Starting from Upcoming Wednesday, Enroll Now                 Best & Oldest CMA Coaching Institute in North India                 Achieved an Impressive Total of 100 CMA All India Ranks Across The Last 15 Attempts                 CMA Offline / Live / Recorded Classes Available                

Final PN-16 Strategic Cost Management Quiz 7

/25
0 votes, 0 avg
0
Created on By CA Sonal Saboo

CMA Final

Final Strategic Cost Management PN-16 Quiz 7

This quiz is based on the CMA Strategic Cost Management paper.
Each question is multiple-choice with 4 options, and only 1 option is correct.
Attempt the quiz to test your understanding of CMA SCM concepts.

1 / 25

Category: Strategic Cost Management PN-16

1. Which of the following statement is correct?

2 / 25

Category: Strategic Cost Management PN-16

2. Tableau is a –

3 / 25

Category: Strategic Cost Management PN-16

3. Delphi Method is used for –

4 / 25

Category: Strategic Cost Management PN-16

4. Which of the following is not true for forecasting?

5 / 25

Category: Strategic Cost Management PN-16

5. If the estimate of the Trend Component is 158.2, the estimate of Seasonal Component is 94%, the estimate of the Cyclical Component is 105% and the estimate of the Irregular Component is 98%, then the multiplicative model will produce a forecast of –

6 / 25

Category: Strategic Cost Management PN-16

6. The actual demand for a period is 100 units. But forecast demand was 90 units. The forecast error is –

7 / 25

Category: Strategic Cost Management PN-16

7. A linear Trend equation has the form –

8 / 25

Category: Strategic Cost Management PN-16

8. In Simple Exponential Smoothing forecast, to give higher weightage to recent demand information, the smoothing constant must be close to –

9 / 25

Category: Strategic Cost Management PN-16

9. Which of the following is not a forecasting technique?

10 / 25

Category: Strategic Cost Management PN-16

10. In a Time Series forecasting model, the demands for five time periods are 10, 13, 15, 18 and 22. A linear regression fit resulted in the equation y = 6.9 + 2.9t, where y is the forecast for the period t. The sum of the absolute deviations for the five data with respect to their corresponding forecasts (taking t = 1 for the first one) is;

11 / 25

Category: Strategic Cost Management PN-16

11. Which of the following is not a Casual Forecasting Method?

12 / 25

Category: Strategic Cost Management PN-16

12. In Exponential Smoothing Method which one of the following is true?

13 / 25

Category: Strategic Cost Management PN-16

13. For a dual plant Monopolist Firm with respective production costs C1 & C2 in the two plants, the necessary condition of equilibrium is:

14 / 25

Category: Strategic Cost Management PN-16

14. A price discriminating Monopolist Firm operates in –

15 / 25

Category: Strategic Cost Management PN-16

15. In the expression D = AC – B2 used for describing the sufficient conditions for unconstrained optimization involving two variables (x and t), the meaning of A and C are –

16 / 25

Category: Strategic Cost Management PN-16

16. MR is:

17 / 25

Category: Strategic Cost Management PN-16

17. For a Cost Function TC = 3 𝑄2+ 7Q + 12, MC is –

18 / 25

Category: Strategic Cost Management PN-16

18. The process of finding relative maximum or minimum of a function is known as:

19 / 25

Category: Strategic Cost Management PN-16

19. Choose the correct answer:

20 / 25

Category: Strategic Cost Management PN-16

20. Optimization is the method of finding:

21 / 25

Category: Strategic Cost Management PN-16

21. A diesel engine manufacturing company has an order of 4 large engines. A crew of 16 members took 4000 hours to assemble the first engine. If 80% Learning Curve is used then what will be the labour cost of the fourth engine, assuming average labour rate to be Rs. 180 per hour?

22 / 25

Category: Strategic Cost Management PN-16

22. When 24 hours is required to produce a condenser of a particular type then the time required to produce the 16th unit with 85% Learning Curve is –

23 / 25

Category: Strategic Cost Management PN-16

23. How long will it take to produce the fifth unit with 85% learning rate, if the third unit took 13 hours?

24 / 25

Category: Strategic Cost Management PN-16

24. Bimal and Kamal are the two industrial workers engaged in doing a similar job. They have different learning rates of 80% and 90% respectively. Times taken to complete their first jobs are respectively 12 and 8 hours. If both continue with the same learning rate then after how many units Bimal will be faster than Kamal?

25 / 25

Category: Strategic Cost Management PN-16

25. Which of the following is not an application of Learning Curve?

Your score is

The average score is 0%

0%