Dhruv Coaching Classes

CMA New Batches Starting from Upcoming Wednesday, Enroll Now                 Best & Oldest CMA Coaching Institute in North India                 Achieved an Impressive Total of 100 CMA All India Ranks Across The Last 15 Attempts                 CMA Offline / Live / Recorded Classes Available                 CMA New Batches Starting from Upcoming Wednesday, Enroll Now                 Best & Oldest CMA Coaching Institute in North India                 Achieved an Impressive Total of 100 CMA All India Ranks Across The Last 15 Attempts                 CMA Offline / Live / Recorded Classes Available                

Inter PN-9 OMSM Quiz 6

/25
0 votes, 0 avg
3
Created on By CA Sonal SabooCA Sonal Saboo

CMA Inter

Inter OMSM PN-9 Quiz 6

This quiz is based on the CMA Operations Management and Strategic Management paper.
Each question is multiple-choice with 4 options, and only 1 option is correct.
Attempt the quiz to test your understanding of CMA OMSM concepts.

1 / 25

Category: Operations Management and Strategic Management PN-9

The most powerful and popular method for solving linear programming problem is

2 / 25

Category: Operations Management and Strategic Management PN-9

Most suitable layout for continuous production is

3 / 25

Category: Operations Management and Strategic Management PN-9

In a queuing system, the speed with which service is provided can be expressed in either of two ways—

4 / 25

Category: Operations Management and Strategic Management PN-9

Selection of plant location is influenced by few factors. Which one of the following is not a factor?

5 / 25

Category: Operations Management and Strategic Management PN-9

In sequencing it is the difference between the time remaining to due date and the remaining processing time. It is

6 / 25

Category: Operations Management and Strategic Management PN-9

Simulation is the representation of a real life situation by different means. It is popular because---

7 / 25

Category: Operations Management and Strategic Management PN-9

The objective of application of linear programming in industrial problems is

8 / 25

Category: Operations Management and Strategic Management PN-9

Which of the following is not a method for solving Assignment problem?

9 / 25

Category: Operations Management and Strategic Management PN-9

Which one of the following is not a limitation of linear programming model?

10 / 25

Category: Operations Management and Strategic Management PN-9

In a linear programming model feasible solution is

11 / 25

Category: Operations Management and Strategic Management PN-9

Linear Programming is a technique used for determining:

12 / 25

Category: Operations Management and Strategic Management PN-9

The main question in an assignment problem is

13 / 25

Category: Operations Management and Strategic Management PN-9

Which one of the following is a Sequencing rule for single facility?

14 / 25

Category: Operations Management and Strategic Management PN-9

Which one of the following product is not suitable for flow shop scheduling?

15 / 25

Category: Operations Management and Strategic Management PN-9

The scope of Production Planning and Control is:

16 / 25

Category: Operations Management and Strategic Management PN-9

One of the important production documents is:

17 / 25

Category: Operations Management and Strategic Management PN-9

In Operation Planning

18 / 25

Category: Operations Management and Strategic Management PN-9

In Process Planning we plan:

19 / 25

Category: Operations Management and Strategic Management PN-9

The starting point of Production cycle is:

20 / 25

Category: Operations Management and Strategic Management PN-9

Routing and Scheduling becomes relatively complicated in

21 / 25

Category: Operations Management and Strategic Management PN-9

The material handling cost per unit of product in Continuous production is:

22 / 25

Category: Operations Management and Strategic Management PN-9

Inventory cost per product in intermittent production is:

23 / 25

Category: Operations Management and Strategic Management PN-9

Generally in continuous production the production is carried out to:

24 / 25

Category: Operations Management and Strategic Management PN-9

One of the product examples for Line layout is:

25 / 25

Category: Operations Management and Strategic Management PN-9

Most suitable layout for Continuous production is:

Your score is

The average score is 68%

0%