CMA New Batches Starting from Upcoming Wednesday, Enroll Now                 Best & Oldest CMA Coaching Institute in North India                 Achieved an Impressive Total of 100 CMA All India Ranks Across The Last 15 Attempts                 CMA Offline / Live / Recorded Classes Available                 CMA New Batches Starting from Upcoming Wednesday, Enroll Now                 Best & Oldest CMA Coaching Institute in North India                 Achieved an Impressive Total of 100 CMA All India Ranks Across The Last 15 Attempts                 CMA Offline / Live / Recorded Classes Available                

Inter PN-8 Cost Accounting Quiz 7

/25
0 votes, 0 avg
0
Created on By CA Sonal SabooCA Sonal Saboo

CMA Inter

Inter Cost Accounting PN-8 Quiz 7

This quiz is based on the CMA Cost Accounting paper.
Each question is multiple-choice with 4 options, and only 1 option is correct.
Attempt the quiz to test your understanding of CMA CA concepts.

1 / 25

Category: Cost Accounting PN-8

Which of the following is not an element of works overhead?

2 / 25

Category: Cost Accounting PN-8

What is prime cost ?

3 / 25

Category: Cost Accounting PN-8

Which of the following are direct expenses?(1) The cost of special designs, drawings or layouts,(2) The hire of tools or equipment for a particular job,(3) Salesman’s wages,(4) Rent, rates and insurance of a factory

4 / 25

Category: Cost Accounting PN-8

Which of the following items is not excluded while preparing a cost sheet?

5 / 25

Category: Cost Accounting PN-8

Which of the following items is not included in preparation of cost sheet?

6 / 25

Category: Cost Accounting PN-8

CAS 13 stands for:

7 / 25

Category: Cost Accounting PN-8

          deals with the principles and methods of determining the production or operation overheads.

8 / 25

Category: Cost Accounting PN-8

Which standard deals with the principles and methods of determining the manufacturing Cost of excisable goods?

9 / 25

Category: Cost Accounting PN-8

Which standards deals with determination of averages/ equalized transportation cost?

10 / 25

Category: Cost Accounting PN-8

Which standards deals with the principles and methods of determining depreciation and amortization cost?

11 / 25

Category: Cost Accounting PN-8

Standard deals with the cost of service cost center is:

12 / 25

Category: Cost Accounting PN-8

CAS 21 stands for:

13 / 25

Category: Cost Accounting PN-8

The following is an example of direct expenses as per CAS-10:

14 / 25

Category: Cost Accounting PN-8

Which of the following overhead cost may not be apportioned on the basis of Direct Wages?

15 / 25

Category: Cost Accounting PN-8

When Absorbed Overhead is Higher than the amount of Overhead incurred , it is called

16 / 25

Category: Cost Accounting PN-8

The difference between Actual Factory Overhead and Absorbed Factory Overhead will be usually at the minimum level , provided pre-determined overhead rate is based on :

17 / 25

Category: Cost Accounting PN-8

Which of the following is not treated as a Manufacturing Overhead?

18 / 25

Category: Cost Accounting PN-8

packing Cost is part of

19 / 25

Category: Cost Accounting PN-8

Distribution of service Department Overheads Cost to production Departments using different assumptions and methods is known as

20 / 25

Category: Cost Accounting PN-8

Charging of common Overheads cost to various cost centres, using appropriate bases is known as -

21 / 25

Category: Cost Accounting PN-8

Maximum Possible Productive Capacity of a plant when no operating time is lost is its :

22 / 25

Category: Cost Accounting PN-8

Capacity is defined as actually utilised capacity of a plant.

23 / 25

Category: Cost Accounting PN-8

Fixed over costs are not effected in monetary terms during a fiven period by a change in Output. But this statement is valid provided

24 / 25

Category: Cost Accounting PN-8

If Actual Output in 8 hours is 700 units , Standard Output is 90 units per hour , Efficiency Ratio is

25 / 25

Category: Cost Accounting PN-8

If Std Time is 8 hours , Actual time is 6 hours ,rate per hour is Rs. 100 , Rwan Wages =